Design and installation of a chemical cleaning system for boiler No. 7 at TPP 2 of Qarmet JSC
calendar_today
May be interesting
arrow_forward
Reconstruction of sections 2 and 3 of the Yesil River in Astana, 8 km long
Scope of work: -Dredging the riverbed with a dredger-Bank stabilization with piles and Larsen sheet piles-Construction of hydraulic structures
arrow_forward
Bank protection works along a 4.5 km stretch of the Ural River in the village of Makhambet in the Atyrau region
Состав работ: - Разработка ПСД с прохождением государственной экспертизы, с применением новых технологий - габионных конструкций ROCK BOX, а также шпунтов AZ 18-800 - Авторский надзор
arrow_forward
Development of design and estimate documentation for the restoration of gas ducts at the Central Heating and Power Plant of JSC AMT
arrow_forward
Modernization of the main building of the Balkhash enrichment plant
Создание информационной 3D модели на основании сформированного облака точек Расчет КМ, КЖ конструкции на основании информационной модели на базе ПО ЛИРА сапр Построение рабочей модели с последующим формирование и выдачей рабочей документации 2D Построение совмещенной 3D модели согласно предоставляемых смежных разделов разрабатываемых поставщиком оборудования BIM сопровождение проекта
arrow_forward
Scanning of horizontal underground workings (at a depth of more than 500 m) of JSC Kazakhaltyn Mining and Metallurgical Company, Zholymbet mine
Состав работ: Подсчет объемов выработок шахты Облако точек в формате .pts, 3D Mesh модель в формате .dxf. Облако точек в формате .pts, 3D Mesh модель, расчет объема модели
arrow_forward