Scope of work:
1. Deaerator and pump piping
2. Earthworks, pouring foundations
3. Installation of supporting metal structures
4. Installation of the pipeline
5. Integration into an existing system
6. Installation of instrumentation and control systems
7. Hydrotesting, commissioning